Ersatzteile
per page
Set Descending Direction
  1. Wolf PC Board CAD "B" LU-Control 2745577 for GTK-4
    Wolf PC Board CAD "B" LU-Control 2745577 for GTK-4
    €1,000.75
    instead of €1,560.74 **
    -36% You're saving €559.99
    Incl. 19% VAT , plus shipping costs
    Available for order delivery time: 10-28 working days
    Shipping Cost Points: 45
  2. Wolf press nipple for cast links 248271599 for MK-2, (4 pieces required)
    Wolf press nipple for cast links 248271599 for MK-2, (4 pieces required)
    €93.80
    instead of €144.12 **
    -35% You're saving €50.33
    Incl. 19% VAT , plus shipping costs
    Available for order delivery time: 10-28 working days
    Shipping Cost Points: 52
  3. Wolf O-ring seal 110x3.5 3910140 for gas condensing boiler
    Wolf O-ring seal 110x3.5 3910140 for gas condensing boiler
    €5.56
    instead of €8.81 **
    -37% You're saving €3.25
    Incl. 19% VAT , plus shipping costs
    Available for order delivery time: 10-28 working days
    Shipping Cost Points: 300
  4. Wolf plate heat exchanger 298206699 for FGB-K-28/35
    Wolf plate heat exchanger 298206699 for FGB-K-28/35
    €157.18
    instead of €243.44 **
    -35% You're saving €86.26
    Incl. 19% VAT , plus shipping costs
    Available for order delivery time: 10-28 working days
    Shipping Cost Points: 84
  5. Wolf pump DN 25/6 self-priming 180 2072231 for piping groups from 2016
    Wolf pump DN 25/6 self-priming 180 2072231 for piping groups from 2016
    €383.00
    instead of €591.42 **
    -35% You're saving €208.42
    Incl. 19% VAT , plus shipping costs
    Available for order delivery time: 10-28 working days
    Shipping Cost Points: 238
  6. Wolf locking clip male 207096999 for CSZ
    Wolf locking clip male 207096999 for CSZ
    €5.56
    instead of €8.56 **
    -35% You're saving €3.00
    Incl. 19% VAT , plus shipping costs
    Available for order delivery time: 10-28 working days
    Shipping Cost Points: 1
  7. Wolf profile edge protection 160 long - 3mm 2484834 for MGK-2-130-300
    Wolf profile edge protection 160 long - 3mm 2484834 for MGK-2-130-300
    €8.83
    instead of €13.76 **
    -36% You're saving €4.93
    Incl. 19% VAT , plus shipping costs
    Available for order delivery time: 10-28 working days
    Shipping Cost Points: 2
  8. Wolf locking clip female 207098299 for CSZ
    Wolf locking clip female 207098299 for CSZ
    €5.56
    instead of €8.58 **
    -35% You're saving €3.02
    Incl. 19% VAT , plus shipping costs
    Available for order delivery time: 10-28 working days
    Shipping Cost Points: 1
  9. Wolf regulation 8614421 for FGB-(K)
    Wolf regulation 8614421 for FGB-(K)
    €362.93
    instead of €552.03 **
    -34% You're saving €189.10
    Incl. 19% VAT , plus shipping costs
    Available for order delivery time: 10-28 working days
    Shipping Cost Points: 158
  10. Wolf Red. Coupling 1/2"x1/4" CW617N 2072157 for FWS
    Wolf Red. Coupling 1/2"x1/4" CW617N 2072157 for FWS
    €39.66
    instead of €60.87 **
    -35% You're saving €21.21
    Incl. 19% VAT , plus shipping costs
    Available for order delivery time: 10-28 working days
    Shipping Cost Points: 4
  11. Wolf controller with display cpl. 2745804 for SWP
    Wolf controller with display cpl. 2745804 for SWP
    €715.05
    instead of €1,086.52 **
    -34% You're saving €371.47
    Incl. 19% VAT , plus shipping costs
    Available for order delivery time: 10-28 working days
    Shipping Cost Points: 15
  12. Wolf pipe storage follow-up flow/return 2071876 for CGS-2R
    Wolf pipe storage follow-up flow/return 2071876 for CGS-2R
    €16.24
    instead of €24.94 **
    -35% You're saving €8.70
    Incl. 19% VAT , plus shipping costs
    Available for order delivery time: 10-28 working days
    Shipping Cost Points: 16
per page
** Average Wholesale Price